Seaver Gymnasium


This building was originally built for the School
of Physical Education in 1890 at a cost of $2,700. Eventually it began to be
used by the Boys and Girls Club. At various times throughout it's history, the
building has also been used by the High School Club(1930s-1950s) and by the Chautauqua
School of Dance(early 1980s). The top floor is a gymnasium. It was one of the
first places in the country to have basketball hoops installed. The bottom floor,
known as "The Bath House", has separate changing rooms for boys and
girls for swimming. The bath houses were remodeled in 1938, and then the entire
building received a major renovation in 2000. The building originally had a
ramp leading up to the second floor but was removed in place of stairs years
later. In 2000, these old stairs were removed and a new ramp was added, bringing
the past to life once again. |